Iron Ore Mining in Africa

December 12, 2011

Thor Global has successfully designed and manufactured a 135ft long by 48 belt width Telescopic Stacker with a capacity of 2200 MTPH for one of Africa’s biggest iron mining sites.

stacker, africa, stockpile, iron ore, mining, port

What was also originally a 14-15 week project ended up being completed in 9-10 weeks due to the customers tighter time restrictions. This galvanized stacker is one of the first 48in stackers designed with a higher capacity to stockpile iron ore. It is also one of the first machines to be designed and distributed for this customer in Africa.

The stacker was originally supposed to be shipped to the mining facility, however, due to an emergency at the port facility it was first utilized there before being moved anywhere else. This unique circumstance proves just how versatile the ThorStackers are, and when help is needed,

Thor Global will always come to the rescue!